The inspector wrote Federal Pacific on the report. Tulsa still wants a trade permit from a licensed electrician. PSO still wants its own ticket before anyone opens a meter seal.
Development Services issues the trade permit to a licensed electrician only. PSO's Modify Home Service request is how the meter comes off. Those two systems do not match. A helper with a van cannot print that permit or cut PSO's seal.
What PSO actually wrote
Start with the Service Rules. Meters and metering equipment used in measuring the amount of electric service are furnished by and shall remain the property of PSO.
PSO meters, equipment, or enclosures shall be locked or sealed.
Unauthorized removal of the lock or seal is prohibited. When the lock or seal is missing or opened by persons other than PSO employees or authorized agents, you may be charged $50 plus all costs to repair or replace facilities and for PSO to inspect and reseal the meter and equipment.
The Modify Home Service page is the request path. Use it for removal of your existing meter and/or electric service drop. Use it for repositioning the meter. Use it for upgrading electrical service.
The Permit Center issues the electrical trade permit. PSO will not treat a cut seal as ordinary maintenance. Those two systems do not match.
Confirm the logo on the bill. Most Tulsa, Owasso, Broken Arrow, and Bixby addresses are PSO.
PSO does not publish a guaranteed power-off hour count. Half Moon describes most residential panel upgrades as a single day on site. That is a contractor field note.
Permits inside Tulsa and in the nearby towns
Inside the city, start at Development Services, Permit Center, 175 E. 2nd Street, 4th Floor. Electrical files go through the Self-Service Portal, or on paper at the counter. Trade questions go to 918-596-9656.
Who pulls the permit matters. The Applications and Forms page is a closed list. Only a Licensed tradesperson may apply for trade permits. The Plans Review page repeats it. Trade contractors that are licensed by the City and State and registered with Development Services may pull trade permits. There is no owner-occupant electrical-permit path on those pages.
Owasso, Broken Arrow, Bixby, and Jenks file at their own counters. A quote that only says “we handle the permit” should name the city on the address.
Price, without inventing one
Half Moon’s own blogs publish two Tulsa bands and do not hide the spread. A May blog prints electrical panel replacement at $1,500 to $3,500. A February blog prints a complete panel upgrade at $1,300 to $3,000.
Those two systems do not match. We will not average them. We are not inventing a Tulsa midpoint from either post.
Oklahoma license lookup is public. Ask for the CIB number and check it on the Construction Industries Board before you sign. For a city address, also ask for the city registration they will put on the trade-permit file. One shop advertises this work on their own site and prints a license number. Half Moon’s Tulsa panel-upgrades page names Federal Pacific, Zinsco, and Pushmatic and prints Electrical Contractor Lic# 00140295. They write daily work across Tulsa, Owasso, Broken Arrow, Bixby, and Jenks. They are listed for the panel letter, not as a Tulsa County directory.
Directory-only shops are omitted. A page that names these brands and does not print an Oklahoma electrical license number is not a listing. The listed shop is not affiliated with Panel Letter.
What to hand the carrier
The useful packet is the closed city or suburban electrical permit, the passed inspection, an invoice with the license number that was on the permit, and photos if the letter asks. If your electrician produces a load calculation or panel schedule, send that too. We did not find a carrier page that publishes a single statewide sticker form. Ask the agent what they will actually open.
Typical replacement cost
One Tulsa shop publishes two panel bands that do not match. We do not invent a midpoint
$1,500 to $3,500
Electrical panel replacement in Tulsa, printed as a typical range
Their May 19 blog. The same sentence says the number moves with amperage, permitting, and existing wiring. We are not inventing a Tulsa midpoint from this band.
Source: Half Moon Plumbing & Electric$1,300 to $3,000
Complete electrical panel upgrade in Tulsa
Their February 11 blog. That band is tighter than the $1,500 to $3,500 replacement line on the later blog. Those two systems do not match.
Source: Half Moon Plumbing & Electric
Permit
City of Tulsa Development Services, Permit Center
Who pulls it: Tulsa’s Permit Center is 175 E. 2nd Street, 4th Floor. Permit Center hours are Monday through Friday, 8 a.m. to 4 p.m. The main Permit Center phone is 918-596-9456. Trade permits questions go to tradepermits@cityoftulsa.org or 918-596-9656. Building and license questions go to bldgandLic@cityoftulsa.org. Applications run through the Self-Service Portal, or on paper at the Permit Center. The Applications and Forms page is blunt. Please note that only a Licensed tradesperson may apply for trade permits. The Plans Review page repeats the contractor path. Trade contractors that are licensed by the City and State and registered with Development Services may pull trade permits. There is no owner-occupant electrical-permit path on those pages. Broken Arrow, Owasso, Bixby, and Jenks may file at a different counter than 175 E. 2nd Street.
Owasso, Broken Arrow, Bixby, and Jenks each have their own building department. A quote that only says we handle the permit should name the city on the address. Oklahoma electrical-contractor licensing is the Construction Industries Board. The city also wants its own contractor registration. Ask for the CIB number they will put on the trade-permit file.
Utility coordination
Public Service Company of Oklahoma on most Tulsa bills
Who disconnects: PSO’s Service Rules and Conditions of Service are blunt. Meters and metering equipment used in measuring the amount of electric service are furnished by and shall remain the property of PSO. PSO meters, equipment, or enclosures shall be locked or sealed. Unauthorized removal of the lock or seal is prohibited. When the lock or seal is missing or opened by persons other than PSO employees or authorized agents, you may be charged $50 plus all costs to repair or replace facilities and for PSO to inspect and reseal the meter and equipment. PSO’s Modify Home Service page is the request path for removal of your existing meter and/or electric service drop, repositioning of the meter, and upgrading electrical service. That form is how PSO wants the work requested. That is not a homeowner meter-pull path.
Outage window: PSO does not publish a guaranteed power-off hour count for a residential panel swap.
Confirm the logo on the bill before anyone prices the job. Most Tulsa, Owasso, Broken Arrow, and Bixby addresses are PSO. A like-for-like panel swap still needs the PSO ticket and the city inspection. A service-size change is a PSO Modify Home Service request as well as the trade permit.
What to hand the insurer
- Closed City of Tulsa or suburban electrical trade permit
- Passed Development Services or suburban inspection
- Invoice showing the Oklahoma CIB license used on the permit
- Photos of the old and new panel if the carrier’s letter asks for them
- Load calculation or panel schedule if the electrician produced one
Ask your agent for the exact list. Carriers do not publish a single national checklist.
Electricians who advertise this job
A shop is listed only if it advertises Federal Pacific, Zinsco, or insurance-driven panel replacement on its own site and prints a license number there. Trade-association locators already exist. We will not pad this list. Verify the license before you hire.
To get introduced, use the quote form on this page. We do not send you to the shop from here.
Half Moon Plumbing & Electric
Owasso / Tulsa, OK
Published license: 00140295 (Oklahoma Construction Industries Board)
Own Tulsa panel-upgrades page that names Federal Pacific, Zinsco, and Pushmatic, describes Stab-Lok breaker failures, and prints Electrical Contractor Lic# 00140295.
How this page was built
Compiled by Panel Letter on 2026-09-20 from the public pages below. If a fact was not on a cited page, it is marked as unverified in the copy. This is a research guide, not a bid.
- Half Moon Plumbing & Electric, Electrical panel upgrades in Tulsa
Names Federal Pacific, Zinsco, and Pushmatic. Describes Stab-Lok breaker failures. Prints Electrical Contractor Lic# 00140295.
- Half Moon Plumbing & Electric, Upgrade your electrical panel in Tulsa
Prints $1,500 to $3,500 for electrical panel replacement in Tulsa. Prints Electrical Contractor Lic# 00140295 in the footer.
- Half Moon Plumbing & Electric, Reliable electrical panel upgrade services in Tulsa
Prints $1,300 to $3,000 for a complete panel upgrade. Prints Electrical Contractor License #00140295 in the credentials section.
- City of Tulsa, Permitting
Permit Center at 175 E. 2nd Street, 4th Floor. Hours 8 a.m. to 4 p.m. Phone 918-596-9456. Trade permits email tradepermits@cityoftulsa.org.
- City of Tulsa, Applications and forms
Only a Licensed tradesperson may apply for trade permits. Electrical Permit Request Form is listed under Trade Permit Applications.
- City of Tulsa, Plans review
Trade contractors licensed by the City and State and registered with Development Services may pull trade permits. Trade Permits Center 918-596-9656.
- PSO, Service Rules and Conditions of Service
PSO meters, equipment, or enclosures shall be locked or sealed. Unauthorized removal of the lock or seal is prohibited. Missing or opened seals can be charged $50 plus repair and reseal costs.
- PSO, Modify Home Service
Request path for meter removal, meter repositioning, and electrical-service upgrades. Links the Meter and Service Guide.
- Oklahoma Construction Industries Board, Licensee search
Official Oklahoma electrical-contractor lookup.