Brian Head weekends and a 1970s ranch box is how a lot of Cedar City letters start. The carrier still named Federal Pacific on the panel.
The city inspector will not pull a Rocky Mountain Power meter. Rocky Mountain Power will not print the 10 N Main Street electrical permit. Those two systems do not match. A helper with a van cannot stand in for either one.
What the utilities actually wrote
Most Cedar City bills are Rocky Mountain Power. Confirm the logo on the bill before anyone prices the job.
Start with the Electric Service Requirements. All physical disconnects shall be done by Power Company personnel.
Customers or their agents shall not physically disconnect their service.
That is not a homeowner meter-pull path.
Cedar City’s electric-service page is the work ticket. Apply for and obtain a Building Permit first. Call Rocky Mountain Power at 888-221-7070 for the work order numbers. Temporary and permanent power numbers will not interchange. The city will not schedule the meter inspection without that number. Rocky Mountain Power does not publish a guaranteed power-off hour count.
Permits in Cedar City and in Iron County
Inside Cedar City, start at the Building Department, 10 N Main Street. The phone is 435-865-4519. Files go through the city’s online portal.
Who pulls the permit matters. The city’s permit guide wants applicable DOPL-licensed contractor information before the permit may be issued. That same guide lets a residential owner upload a notarized Owner/Builder form when the owner is doing the work. The Owner-Builder form still limits who may touch the job. Owning the home does not mean you should pull the permit and then hire someone under your name.
Enoch, Parowan, Brian Head, Paragonah, Kanarraville, and unincorporated Iron County file at their own counters. Iron County Building is at 82 N 100 E #102. A quote that only says “we handle the permit” should name the city on the address.
Price, without inventing one
One Cedar City contractor page publishes three 2026 panel bands and does not hide the split.
Fowler Electric’s 2026 cost page prints a 200-amp panel replacement at $2,400 to $3,800. The same page prints a 100-amp to 200-amp upgrade with a meter base at $3,800 to $5,500. Those two lines do not match. We will not average them. The same page prints a third line for a 100-amp to 200-amp job plus a service mast plus Rocky Mountain Power coordination at $4,800 to $7,000. We are not inventing a Main Street midpoint from any of the three.
Utah DOPL lookup is public. Ask for the electrical contractor number and check it before you sign. One shop advertises this work on their own site and prints a license number. Fowler Electric’s replacements page names Federal Pacific, Zinsco, and fuse-based panels. The shop’s own site prints Utah License #12129347-5501. They write daily work across Cedar City and also name St. George, Duck Creek, and Brian Head. They are listed for the panel letter, not as an Iron County directory.
Directory-only shops are omitted. A page that names these brands and does not print a Utah DOPL number is not a listing. The listed shop is not affiliated with Panel Letter.
What to hand the carrier
The useful packet is the closed City of Cedar City, Iron County, or other municipal electrical permit, the passed electrical inspection, an invoice with the license number that was on the permit, and photos if the letter asks. If your electrician produces a load calculation or panel schedule, send that too. We did not find a carrier page that publishes a single statewide sticker form. Ask the agent what they will actually open.
Typical replacement cost
One Cedar City shop publishes three 2026 panel bands that do not match. We are not inventing a Main Street midpoint from them
$2,400 to $3,800
200-amp panel replacement
Their 2026 Cedar City cost page. A 200-amp replacement is not the meter-base upgrade on the same page. Those two lines do not match. We will not average them. We are not inventing a Main Street midpoint from either line.
Source: Fowler Electric LLC$3,800 to $5,500
100-amp to 200-amp upgrade with a meter base
Same 2026 page. A meter-base upgrade is not the 200-amp replacement row. Those two lines do not match. We will not average them.
Source: Fowler Electric LLC$4,800 to $7,000
100-amp to 200-amp upgrade plus a service mast plus Rocky Mountain Power coordination
Same 2026 page. The mast-plus-RMP line is a third number. We will not average it with the other two.
Source: Fowler Electric LLC
Permit
Cedar City Building Department
Who pulls it: The Building Department sits at 10 N Main Street, Cedar City, UT 84720. Permit technician phone is 435-865-4519. Files go through the city’s online permit portal at cedarcity.mycityinspector.com. The city’s Building Permit Guide is blunt. All permits require applicable DOPL-licensed contractor information before the permit may be issued. Residential projects may upload a notarized Owner/Builder form when the owner is doing the work or even a portion of the work. The city’s Owner-Builder form is just as blunt. Work must be performed by the sole owner, a licensed contractor, a covered employee, or a person under the owner’s supervision who is paid only token compensation. Enoch, Parowan, Brian Head, and unincorporated Iron County are not the 10 N Main Street file.
Enoch, Parowan, Brian Head, Paragonah, Kanarraville, and unincorporated Iron County file at their own counters. Iron County Building sits at 82 N 100 E #102 in Cedar City. The phone is 435-865-5350. A quote that only says we handle the permit should name the city on the address. Utah licensing for this work is a DOPL electrical contractor number. Ask for the number they will put on the Cedar City or Iron County file.
Utility coordination
Rocky Mountain Power on most Cedar City bills
Who disconnects: Rocky Mountain Power’s Electric Service Requirements are blunt on a temporary disconnect. All physical disconnects shall be done by Power Company personnel. Customers or their agents shall not physically disconnect their service. That is not a homeowner meter-pull path. Cedar City’s electric-service page is the work ticket. Apply for and obtain a Building Permit. Electric Meter permits are available when the scope is not covered under another permit type. Contact Rocky Mountain Power at 888-221-7070 to obtain the necessary work order numbers. Temporary and permanent power numbers will not interchange. Inspection and re-inspections will not be scheduled without the work order number.
Outage window: Rocky Mountain Power does not publish a guaranteed power-off hour count for a residential panel swap.
Confirm the logo on the bill before anyone prices the job. Most Cedar City, Enoch, and unincorporated Iron County addresses are Rocky Mountain Power. A like-for-like panel swap still needs the city or county inspection and that Rocky Mountain Power disconnect. A service-size change is still that disconnect and reconnect, not a helper cutting the seal. Fowler writes that Brian Head and Duck Creek add 15 to 25 percent. That is a contractor field note.
What to hand the insurer
- Closed City of Cedar City, Iron County, or other municipal electrical permit
- Passed electrical inspection
- Invoice showing the Utah DOPL contractor number used on the permit
- Photos of the old and new panel if the carrier’s letter asks for them
- Load calculation or panel schedule if the electrician produced one
Ask your agent for the exact list. Carriers do not publish a single national checklist.
Electricians who advertise this job
A shop is listed only if it advertises Federal Pacific, Zinsco, or insurance-driven panel replacement on its own site and prints a license number there. Trade-association locators already exist. We will not pad this list. Verify the license before you hire.
To get introduced, use the quote form on this page. We do not send you to the shop from here.
Fowler Electric LLC
Cedar City, UT
Published license: Utah #12129347-5501 (E200 / E201) (Utah Division of Occupational and Professional Licensing)
Own electrical-replacements page that names Federal Pacific, Zinsco, and fuse-based panels for insurance documentation, backed by Utah License #12129347-5501 printed on the shop’s own site.
How this page was built
Compiled by Panel Letter on 2026-09-29 from the public pages below. If a fact was not on a cited page, it is marked as unverified in the copy. This is a research guide, not a bid.
- Fowler Electric, Electrical replacements
FAQ states many insurers accept policies after an upgrade from Federal Pacific, Zinsco, or fuse-based panels. Prints Utah License #12129347-5501. Public shop email is on this page. Cedar City shop at 2129 W 2650 N.
- Fowler Electric, Cedar City electrician costs in 2026
Prints 200A panel replacement at $2,400 to $3,800, 100A to 200A with meter base at $3,800 to $5,500, and 100A to 200A plus mast plus RMP coordination at $4,800 to $7,000. Prints license #12129347-5501.
- Cedar City, Building and Zoning
10 N Main Street. Permit technician 435-865-4519. Owner-Builder affidavit listed on residential submittal.
- Cedar City, Building Permit Guide
All permits require applicable DOPL-licensed contractor information before issuance. Residential projects may upload a notarized Owner/Builder form.
- Cedar City, Owner-Builder form
Owner certifies work is done by the sole owner, a licensed contractor, a covered employee, or a person paid only token compensation under the owner’s supervision.
- Cedar City, Gas and electric service requirements
Building permit first. Call Rocky Mountain Power at 888-221-7070 for work order numbers. Temporary and permanent numbers do not interchange. No inspection without the work order number.
- Iron County, Building FAQ
A building permit is required for any electrical work. 82 N 100 E #102, Cedar City. Phone 435-865-5350.
- Rocky Mountain Power, Electric Service Requirements