Federal Pacific and Zinsco panels in Spokane still get called out as panels that have to come out. HES’s cost page says so. Avista’s Electric Service Requirements say only Avista personnel shall remove meter seals. Your letter is usually written somewhere else. City permits sit with the Development Services Center. Most bills are Avista.
Those two systems do not match. The city issues the electrical permit. Avista will not treat a cut seal as ordinary maintenance. A helper with a van is not the person who can print that permit or give Avista the 48-hour notice.
What Avista actually wrote
Start with the August 2022 Electric Service Requirements. Section 1.18 is the seal rule. Only Avista personnel shall remove seals. Cutting Avista seals, or bypassing or modifying a meter, can be treated as a crime. Bypassing meter sockets by electricians or customers is not allowed for any reason without Avista approval.
The reconnect rule is next. When Avista disconnects a service for an electrical upgrade, the modifications have to meet current Avista standards. Inspection of that service and equipment is required before reconnection. If the property owner does the work, a final inspection approval must be posted on site. Forty-eight hour notice must be given to Avista for disconnection of service conductors or removal of any meter locking device. That is not a homeowner meter-pull path.
Confirm the logo on the bill. Most Spokane addresses are Avista. Inland Power and Light serves parts of the county.
Avista does not publish a guaranteed power-off hour count. HES describes most upgrades in one business day. That is a contractor field note.
Permits inside Spokane and in the nearby towns
Inside the city, start at the Development Services Center, 808 West Spokane Falls Boulevard. Filing is Accela Citizen Access. The permit team hotline is 509.625.6999.
Who pulls the permit matters. A homeowner path exists, and it is narrow. You may apply for an electrical permit when you are conducting the work yourself. The homeowner is not allowed to apply for an electrical permit and hire the work to be conducted by others. RCW 19.28.261 lets you do electrical work at your own residence without a certified electrician. A friend or a certified electrician may assist only if that person does not take money. Owning the home does not mean you should pull the permit and then hire someone under your name.
Spokane Valley and unincorporated county addresses file at their own counters. A quote that only says “we handle the permit” should name the city on the address.
Price, without inventing one
HES’s Spokane cost page publishes an installed band and does not hide the spread. A full panel replacement is printed at $1,800 to $4,000.
Their 2025 Spokane code page prints a different job. Most 200-amp upgrades there are $2,500 to $4,000. Those two systems do not match. We will not average them. We are not inventing a third Spokane midpoint from either table.
Washington license lookup is public. Ask for the number and check it on Labor and Industries before you sign. One shop advertises this work on their own site and prints a license number. HES’s Spokane cost page names Federal Pacific and Zinsco. The about page of that same site prints ANDERJH811KZ. They list a Moses Lake office and write daily work into Spokane. They are listed for the panel letter, not as a Spokane County directory.
Directory-only shops are omitted. A page that names these brands and does not print a Washington electrical license number is not a listing. The listed shop is not affiliated with Panel Letter.
What to hand the carrier
The useful packet is the closed city or suburban electrical permit, the passed inspection, an invoice with the license number that was on the permit, and photos if the letter asks. If your electrician produces a load calculation or panel schedule, send that too. We did not find a carrier page that publishes a single statewide sticker form. Ask the agent what they will actually open.
Typical replacement cost
One Spokane shop publishes two upgrade bands that do not describe the same job
$1,800 to $4,000
Full panel replacement for most Spokane homeowners, depending on panel size, wiring, labor, and permitting
Their Spokane cost page. They name Federal Pacific, Zinsco, and fuse boxes on that same page. We are not inventing a Spokane midpoint from this band.
Source: Home Electrical Services$2,500 to $4,000
Most 200-amp panel upgrades in Spokane, depending on panel location, wiring condition, and permitting
Their 2025 Spokane code page. This floor is higher than their full-replacement floor. Those two systems do not match.
Source: Home Electrical Services
Permit
City of Spokane Development Services Center, through Accela Citizen Access
Who pulls it: The city’s permit-eligibility handout says homeowners may apply for construction-related permits when they are conducting the construction themselves. For electrical permits, the homeowner is not allowed to apply for an electrical permit and hire the work to be conducted by others. RCW 19.28.261 lets a person do electrical work at their own residence without a license or certified electrician, except on a new building intended for rent, sale, or lease. A friend or certified electrician may assist only if that person does not accept money or other compensation.
Spokane Valley and unincorporated Spokane County file at their own counters. A quote that only says we handle the permit should name the city on the address. Washington electrical licensing is the Department of Labor and Industries. Ask for the number they will put on the Development Services file.
Utility coordination
Avista on most Spokane bills
Who disconnects: Avista’s August 2022 Electric Service Requirements are blunt. Only Avista personnel shall remove meter seals. Bypassing meter sockets by electricians or customers is not allowed for any reason without Avista approval. When Avista disconnects a service to allow an electrical upgrade, reconnection requires the modifications to meet current Avista standards and an inspection of that service and equipment. If the work is performed by the property owner, a final inspection approval must be posted on site. Forty-eight hour notice must be given to Avista for disconnection of service conductors or removal of any meter locking device. That is not a homeowner meter-pull path.
Outage window: Avista does not publish a guaranteed power-off hour count for a residential panel swap.
Confirm the logo on the bill before anyone prices the job. Inland Power and Light serves parts of Spokane County and is not this book. A like-for-like panel swap still needs the Avista ticket and the city inspection.
What to hand the insurer
- Closed City of Spokane or suburban electrical permit
- Passed Development Services or suburban inspection
- Invoice showing the Washington license used on the permit
- Photos of the old and new panel if the carrier’s letter asks for them
- Load calculation or panel schedule if the electrician produced one
Ask your agent for the exact list. Carriers do not publish a single national checklist.
Electricians who advertise this job
A shop is listed only if it advertises Federal Pacific, Zinsco, or insurance-driven panel replacement on its own site and prints a license number there. Trade-association locators already exist. We will not pad this list. Verify the license before you hire.
To get introduced, use the quote form on this page. We do not send you to the shop from here.
Home Electrical Services
Moses Lake / Spokane, WA
Published license: ANDERJH811KZ (Washington Department of Labor and Industries)
Spokane panel-upgrade cost page that names Federal Pacific, Zinsco, and fuse-box replacement and prints Washington License ANDERJH811KZ on the about page of the same site.
How this page was built
Compiled by Panel Letter on 2026-09-12 from the public pages below. If a fact was not on a cited page, it is marked as unverified in the copy. This is a research guide, not a bid.
- Home Electrical Services, How much does an electrical panel upgrade cost in Spokane
Names Federal Pacific, Zinsco, and fuse boxes. Prints $1,800 to $4,000 for a full panel replacement.
- Home Electrical Services, 2025 electrical code updates for Spokane homes
Prints $2,500 to $4,000 for most 200-amp panel upgrades in Spokane.
- Home Electrical Services, About us
Prints License ANDERJH811KZ for founder James Anderson, licensed Master Electrician since 1988.
- Home Electrical Services, Old electrical panels in Spokane
Dedicated FPE and Zinsco page for Spokane. Public shop email is on this page.
- City of Spokane, Residential permit process
Official landing page for residential electrical applications, including who can purchase electrical permits.
- City of Spokane, SMC and RCW on permit eligibility
Homeowner may pull an electrical permit only if that homeowner does the work. Hiring others under a homeowner electrical permit is not allowed.
- Avista, Electric Service Requirements, August 2022
Section 1.18. Only Avista personnel shall remove seals. Forty-eight hour notice for disconnect of service conductors or meter-lock removal.
- Washington Department of Labor and Industries, License verify
Official Washington electrician and electrical-contractor lookup.