Federal Pacific panel replacement in Jacksonville

Avondale bungalows and Springfield cottages still hide Stab-Lok and Zinsco load centers. Inside Duval County the electrical permit is the Building Inspection Division. The meter on most Jacksonville bills is JEA’s.

Last reviewed 2026-09-09. Print this page if you need a copy for someone else in the house.

Jacksonville’s older river neighborhoods still have Federal Pacific and Zinsco load centers that four-point inspectors fail on sight. Avondale, Springfield, Riverside, and the blocks toward San Marco open those doors. Empire’s own FPE page names Stab-Lok breakers that stay closed during a fault. The insurance letter is usually written somewhere else. The work is governed by the Building Inspection Division inside Duval County and, on almost every Jacksonville bill, by JEA.

Those two systems do not match. The city issues the electrical permit. JEA will not put the service back until its own disconnect rules are followed. A helper with a van is not the person who can print that permit or book the meter pull.

What JEA actually wrote

Start with the 2026 Rules and Regulations for Electric Service. Section 1.14 is one sentence at a time. The customer must request a disconnect or removal through the JEA Customer Experience Center. Only JEA personnel will disconnect the service conductors and remove the meters and metering equipment. Customers are not allowed to remove their service-main facilities until all JEA work is complete. That is not a homeowner meter-pull path.

A like-for-like panel swap still needs that JEA ticket. A service-size change is the same ticket plus a capacity conversation with JEA. Confirm the logo on the bill before anyone prices the job. Some nearby Clay and St. Johns addresses are FPL or a co-op, not JEA.

JEA does not publish a guaranteed power-off hour count. Empire describes lining up the utility visit with the crew. That is a contractor field note.

Permits inside Jacksonville and in the nearby counties

Inside Duval County, start at the Building Inspection Division. The residential-permit page cites Florida Building Code section 105.1. You need a permit to install, alter, repair, or replace an electrical system. A licensed electrical contractor pulls the trade permit.

Who pulls the permit matters. Florida’s owner-builder path is real and narrow. The city’s page says a homeowner may obtain a building permit in their own name only on property for their own use and occupancy that is not for sale or lease. You have to appear in person at 214 N. Hogan Street, Room 280. You sign an Owner’s Affidavit. Improvements to an existing house also need proof of Homestead Exemption. Licensed electricians hired by that owner must obtain their own associated electrical permits. Owning the home does not mean you should pull the permit and then hire someone under your name.

St. Johns, Clay, and Nassau file at their own counters. Pure Energy’s panel page talks about St. Johns County permits even while listing Jacksonville in the service area. A quote that only says “we handle the permit” should name the city on the address.

Price, without inventing one

Empire’s 2026 Jacksonville reference guide publishes installed numbers and does not hide the spread. A typical panel upgrade is printed at $850 to $4,000, including materials and labor. The same page prints $1,949.87 as their area figure for a standard 200-amp job. Those are two lines from one shop. We will not average them. We will not invent a second contractor’s midpoint from Angi or HomeAdvisor copy that the same site also quotes.

Florida license lookup is public. Ask for the EC number and check it on DBPR before you sign. Two shops advertise this work on their own sites and print a number. Empire’s Federal Pacific page names Stab-Lok breakers, insurance and four-point language, and EC13004667. Pure Energy’s panel page names Federal Pacific, Zinsco, and Challenger, lists Jacksonville in the service area, and prints EC13010169. Pure Energy is based in St. Augustine. They are listed for the panel letter, not as a St. Johns County directory.

Directory-only shops are omitted. A page that names these brands and does not print an EC number is not a listing. Neither listed shop is affiliated with Panel Letter.

What to hand the carrier

The useful packet is the closed city or county electrical permit, the passed inspection JEA needs before reconnect, an invoice with the EC number that was on the permit, and photos if the letter asks. Florida four-point inspections are often what started the letter. If your electrician produces a load calculation or panel schedule, send that too. We did not find a carrier page that publishes a single statewide sticker form. Ask the agent what they will actually open.

Electricians who advertise this job

A shop is listed only if it advertises Federal Pacific, Zinsco, or insurance-driven panel replacement on its own site and prints a license number there. Trade-association locators already exist. We will not pad this list. Verify the license before you hire.

To get introduced, use the quote form on this page. We do not send you to the shop from here.

Request quotes from licensed electricians who do insurance-flagged panel replacement

We send this to Panel Letter and match it in Jacksonville. No countdown clock, no “four quotes in 60 seconds,” nothing to Angi or Thumbtack.