Salt air is already eating the meter can on this Golden Mile house. The insurance letter just named the Federal Pacific panel behind it.
Construction Services will not pull a Santee Cooper or Horry Electric meter. Those utilities will not print the city electrical permit. Those two systems do not match. A helper with a van cannot stand in for either one.
What the utilities actually wrote
The Grand Strand is split territory. Confirm the logo on the bill before anyone prices the job.
Santee Cooper’s handbook is the beach-side rule. The Customer shall not tamper or otherwise interfere with the proper operation of Santee Cooper’s meter or other equipment.
Only authorized Santee Cooper employees are permitted to connect, disconnect, move, or remove the meter and the meter seal.
Horry Electric Cooperative writes the county-side rule the same way. Only authorized HEC employees are permitted to connect, disconnect, move, or remove the meter and the meter seal.
A meter pulled by an owner or an electrician without HEC consent is prohibited.
Horry Electric also bills a $20 service fee for a disconnect by member request on a panel-box upgrade. Neither utility publishes a guaranteed power-off hour count. Those utilities do not match as one company.
Permits in Myrtle Beach and in Horry County
Inside the city, start at Construction Services. The phone is 843-918-1111. Trade permits go to permittech@cityofmyrtlebeach.com.
Who pulls the permit matters. The city’s residential packet wants a separate electrical permit. That same packet lets only a contractor with a City of Myrtle Beach master tradesman card perform electrical work inside the city. State licensing, a city business license, and that master trade card have to exist before the trade permit is issued. That is not a homeowner electrical path on Ocean Boulevard.
Carolina Forest, Socastee, Forestbrook, and other unincorporated Horry County addresses file at Code Enforcement, not Construction Services. County section 6-3 still wants a permit before an electrical system is installed, altered, or replaced. Horry County’s owner-builder disclosure is a county path. Owning the home does not mean you should pull the permit and then hire someone under your name.
North Myrtle Beach, Conway, and Surfside Beach file at their own counters. A quote that only says “we handle the permit” should name the city on the address.
Price, without inventing one
One Grand Strand contractor page publishes a 200-amp band and does not hide the salt-air adder.
Fogle & Sons’ Myrtle Beach panel page prints most 100-amp to 200-amp upgrades at $2,400 to $4,200. The same FAQ says salt-damaged meter bases or masts can add to that. That is a different scope. We are not inventing a Socastee midpoint from the printed band.
South Carolina LLR lookup is public. Ask for the license number and check it before you sign. Two shops advertise this work on their own sites and print a license number. Fogle’s Myrtle Beach page names Federal Pacific, Zinsco, and insurance-flagged panels and prints License #CLM111551. Loftis Lighting’s North Myrtle Beach page names Federal Pacific Stab-Lok and Zinsco and prints Master Electrician License #2858. They write daily work across Myrtle Beach, North Myrtle Beach, and Socastee. They are listed for the panel letter, not as a Grand Strand directory.
Directory-only shops are omitted. A page that names these brands and does not print a South Carolina license number is not a listing. The listed shops are not affiliated with Panel Letter.
What to hand the carrier
The useful packet is the closed City of Myrtle Beach, Horry County, or other Grand Strand electrical permit, the passed electrical inspection, an invoice with the license number that was on the permit, and photos if the letter asks. If your electrician produces a load calculation or panel schedule, send that too. We did not find a carrier page that publishes a single statewide sticker form. Ask the agent what they will actually open.
Typical replacement cost
One Grand Strand shop prints a 100-amp to 200-amp band; salt-damaged mast work is a different scope. We are not inventing a Socastee midpoint from the printed band
$2,400 to $4,200
Most 100-amp to 200-amp residential upgrades installed, before salt-damaged meter-base or mast work
Their Myrtle Beach panel-upgrade page. The same FAQ says salt-damaged meter bases or masts can add to that. That is a different scope. We are not inventing a Socastee midpoint from the printed band.
Source: Fogle & Sons Electric
Permit
City of Myrtle Beach Construction Services Department
Who pulls it: Construction Services issues city trade permits. Call 843-918-1111. Electrical, plumbing, gas, and mechanical trade permits go to permittech@cityofmyrtlebeach.com. The city’s residential permit packet is blunt. A separate permit is required for electrical work. Only a contractor having a City of Myrtle Beach master tradesman card in that trade may perform electrical work inside the city. Major trades must be licensed by the State of South Carolina and must hold a City of Myrtle Beach business license and a master trade card before the trade permit is issued. That is not a homeowner electrical path inside city limits. Outside the city, Carolina Forest, Socastee, Forestbrook, and much of the 29579 and 29588 ZIPs file at Horry County Code Enforcement. County section 6-3 requires a permit before an electrical system is erected, installed, enlarged, altered, repaired, removed, converted, or replaced. North Myrtle Beach is not the Myrtle Beach Construction Services file.
North Myrtle Beach, Conway, Surfside Beach, and unincorporated Horry County file at their own counters. A quote that only says we handle the permit should name the city on the address. South Carolina electrical-contractor advertising is the LLR number. Ask for the number they will put on the Myrtle Beach or Horry County file.
Utility coordination
Santee Cooper or Horry Electric Cooperative, depending on the bill
Who disconnects: The Grand Strand is split territory. Confirm the logo on the bill before anyone prices the job. Santee Cooper’s Meter Installation Specifications Handbook, section 305, is blunt. The Customer shall not tamper or otherwise interfere with the proper operation of Santee Cooper’s meter or other equipment. Only authorized Santee Cooper employees are permitted to connect, disconnect, move, or remove the meter and the meter seal. Horry Electric Cooperative’s handbook is just as blunt. Only authorized HEC employees are permitted to connect, disconnect, move, or remove the meter and the meter seal. A meter pulled by an owner or an electrician without HEC consent is prohibited. Horry Electric’s service rules add a $20 service fee for work at the member’s premises, including a disconnect by member request for an electrical panel-box upgrade. That is not a homeowner meter-pull path on either utility.
Outage window: Neither Santee Cooper nor Horry Electric Cooperative publishes a guaranteed power-off hour count for a residential panel swap.
A Myrtle Beach mailing address does not tell you which utility owns the seal. Fogle writes that Santee Cooper serves the beach side of Horry County and Horry Electric Cooperative serves unincorporated-county accounts. Those utilities do not match as one company. A like-for-like panel swap still needs the city or county inspection and that utility disconnect. A service-size change is still that disconnect and reconnect, not a helper cutting the seal. Fogle writes that a standard panel swap is a single-day job. That is a contractor field note.
What to hand the insurer
- Closed City of Myrtle Beach, Horry County, or other Grand Strand electrical permit
- Passed electrical inspection
- Invoice showing the South Carolina license number used on the permit
- Photos of the old and new panel if the carrier’s letter asks for them
- Load calculation or panel schedule if the electrician produced one
Ask your agent for the exact list. Carriers do not publish a single national checklist.
Electricians who advertise this job
A shop is listed only if it advertises Federal Pacific, Zinsco, or insurance-driven panel replacement on its own site and prints a license number there. Trade-association locators already exist. We will not pad this list. Verify the license before you hire.
To get introduced, use the quote form on this page. We do not send you to the shop from here.
Fogle & Sons Electric
Myrtle Beach / Columbia, SC
Published license: CLM111551 (South Carolina Department of Labor, Licensing and Regulation)
Own Myrtle Beach panel-upgrade page that names Federal Pacific, Zinsco, insurance-flagged panels, and fuse boxes, backed by SC License #CLM111551 printed on that same page.
Loftis Lighting & Electrical
North Myrtle Beach, SC
Published license: 2858 (South Carolina Department of Labor, Licensing and Regulation)
Own North Myrtle Beach panel-upgrade page that names Federal Pacific Stab-Lok and Zinsco evaluation and replacement, backed by South Carolina Master Electrician License #2858 printed on that same page.
How this page was built
Compiled by Panel Letter on 2026-09-28 from the public pages below. If a fact was not on a cited page, it is marked as unverified in the copy. This is a research guide, not a bid.
- Fogle & Sons Electric, Electrical panel upgrades in Myrtle Beach
Names Federal Pacific, Zinsco, insurance-flagged panels, and fuse boxes. Prints License #CLM111551. Prints most 100-amp to 200-amp upgrades at $2,400 to $4,200 and says salt-damaged meter bases or masts can add to that. Names City of Myrtle Beach Construction Services and Horry County Code Enforcement. Names Santee Cooper and Horry Electric Cooperative as a split.
- Loftis Lighting & Electrical, Electrical panel upgrades in North Myrtle Beach
Names Federal Pacific Stab-Lok and Zinsco. Prints Master Electrician License #2858. Public shop email is on this page. 2211 Gazebo Ct, North Myrtle Beach.
- City of Myrtle Beach, Construction Services Department
Trade permits. Inspections at 843-918-1111. Electrical trade permits to permittech@cityofmyrtlebeach.com.
- City of Myrtle Beach, Residential permit procedures packet
A separate electrical permit is required. Only a contractor with a City of Myrtle Beach master tradesman card may perform electrical work in the city. State license plus city business license and master trade card are required before the trade permit is issued.
- Horry County, When to get a building permit
Section 6-3. A permit is required before an electrical system is erected, installed, enlarged, altered, repaired, removed, converted, or replaced.
- Santee Cooper, Meter Installation Specifications Handbook
Section 305. Only authorized Santee Cooper employees may connect, disconnect, move, or remove the meter and the meter seal.
- Horry Electric Cooperative, Meter Installation and Specification Handbook
Section 5.9. Only authorized HEC employees may connect, disconnect, move, or remove the meter and the meter seal. A meter pulled by an owner or electrician without HEC consent is prohibited.
- Horry Electric Cooperative, Service Rules and Regulations
A $20 service fee applies to work at the member’s premises, including a disconnect by member request for an electrical panel-box upgrade.
- South Carolina LLR, License lookup
Official South Carolina contractor lookup.