The disclosure packet named Zinsco on a Santa Maria house. Building and Safety still wants the electrical permit at 110 S. Pine Street. PG&E still wants its own ticket before anyone breaks a meter seal.
Building and Safety issues the electrical permit at Room 101. PG&E's application is required before anyone breaks a meter seal. Those two systems do not match. A helper with a van cannot print that permit or cut PG&E's seal.
What PG&E actually wrote
Start with the 2026 Greenbook. Do not remove or interfere with PG&E meters, seals, padlocks, or other locking devices.
Applicants are not allowed to install any device, disconnect, or connect to PG&E’s service or equipment, including PG&E’s electric meters.
State law prohibits tampering with or connecting to utility property without PG&E’s consent.
If service or meter removal is required, contact PG&E through the application process. Electric Rule 31 repeats the socket rule. Only PG&E personnel and PG&E’s authorized agents are permitted to remove or reinstall a PG&E meter. Applicants, their agent, or any other third party may not breach the seal around that meter.
The city issues the electrical permit. PG&E will not treat a cut seal as ordinary maintenance. Those two systems do not match.
Confirm the logo on the bill. Most Santa Maria, San Luis Obispo, and Lompoc addresses still show PG&E on the delivery side. Some Central Coast bills also name 3CE for generation. PG&E still owns the meter.
PG&E does not publish a guaranteed power-off hour count. MAG describes one Santa Maria Federal Pacific job as one day on site. That is a contractor field note.
Permits inside Santa Maria and on the Central Coast
Inside the city, start at the Building Division, 110 S. Pine Street, Room 101. The city’s FAQ is short. A permit is required for anything that involves electrical work. Phone is 805-925-0951 x2241.
Who pulls the permit matters. CSLB’s owner-builder exemption can cover a principal residence if the work is performed before sale, you live there for the 12 months before completion, and you have not used the exemption on more than two structures in three years. Electrical work performed for hire still needs a C-10. Owning the home does not mean you should pull the permit and then hire someone under your name.
San Luis Obispo, Lompoc, Paso Robles, and unincorporated Santa Barbara County file at their own counters. A quote that only says “we handle the permit” should name the city on the address.
Price, without inventing one
MAG’s homepage publishes one completed Santa Maria number and does not dress it up as a citywide average. A Federal Pacific panel replacement plus a Tesla charger circuit is printed at $5,400 as a fixed-price job. That same write-up included a corroded weatherhead.
That line does not describe a bare same-location swap. We will not average them. We are not inventing a Central Coast midpoint from this one invoice.
California license lookup is public. Ask for the C-10 number and check it on CSLB before you sign. One shop advertises this work on their own site and prints a license number. MAG’s homepage names Federal Pacific and Zinsco and prints CSLB License #1115849. They write daily work across Santa Maria, San Luis Obispo, Lompoc, and the Santa Ynez Valley. They are listed for the panel letter, not as a Central Coast directory.
Directory-only shops are omitted. A page that names these brands and does not print a California electrical license number is not a listing. The listed shop is not affiliated with Panel Letter.
What to hand the carrier
The useful packet is the closed city or county electrical permit, the passed inspection, an invoice with the C-10 number that was on the permit, and photos if the letter asks. If your electrician produces a load calculation or panel schedule, send that too. We did not find a carrier page that publishes a single statewide sticker form. Ask the agent what they will actually open.
Typical replacement cost
One Santa Maria shop published a fixed price for a Federal Pacific swap plus a charger circuit. We do not invent a Central Coast midpoint
$5,400
One-day Santa Maria Federal Pacific panel replacement plus Tesla charger circuit, printed as a completed fixed-price job
Their homepage case study. The same job included a corroded weatherhead and a 50-amp charger circuit. That is not a bare same-location panel swap. We are not inventing a Central Coast midpoint from this one number.
Source: MAG Electric
Permit
City of Santa Maria Community Development, Building Division
Who pulls it: The Building Division permit counter is 110 S. Pine Street, Room 101. Counter hours are 8:00 a.m. to 4:00 p.m. Phone is 805-925-0951 x2241. Email is CommDev@cityofsantamaria.org. The city’s Building FAQ says a permit is required for anything that involves electrical, mechanical, plumbing, or erecting of walls. California’s owner-builder rules sit at CSLB. A homeowner improving a principal residence can be exempt from licensure if the work is performed before sale, the homeowner resides in the residence for the 12 months before completion, and the exemption has not been used on more than two structures in any three-year period. Electrical work performed for hire still needs a CSLB C-10 contractor. San Luis Obispo, Lompoc, and unincorporated Santa Barbara County file at their own counters.
San Luis Obispo, Lompoc, Paso Robles, and unincorporated Santa Barbara County may file at a different counter than 110 S. Pine Street. A quote that only says we handle the permit should name the city on the address. California licensing for this work is CSLB C-10. Ask for the number they will put on the city or county file.
Utility coordination
PG&E on most Santa Maria bills
Who disconnects: PG&E’s 2026 Electric and Gas Service Requirements (Greenbook) list what applicants and contractors must not do. Do not remove or interfere with PG&E meters, seals, padlocks, or other locking devices. Applicants are not allowed to install any device, disconnect, or connect to PG&E’s service or equipment, including PG&E’s electric meters. State law prohibits tampering with or connecting to utility property without PG&E’s consent. If service or meter removal is required, applicants must contact PG&E through the application process. Electric Rule 31 repeats the meter rule for devices at the socket. Only PG&E personnel and PG&E’s authorized agents are permitted to remove or reinstall a PG&E meter. Applicants, their agent, or any non-PG&E third party may not access or breach the seal surrounding PG&E’s electric meter. That is not a homeowner meter-pull path.
Outage window: PG&E does not publish a guaranteed power-off hour count for a residential panel swap.
Confirm the logo on the bill before anyone prices the job. Most Santa Maria, San Luis Obispo, and Lompoc addresses still have PG&E on the delivery side. Some Central Coast bills also name 3CE for the generation charge. PG&E still owns the meter. A like-for-like panel swap still needs the PG&E ticket and the city or county inspection. A service-size change is a PG&E project application as well as the building permit.
What to hand the insurer
- Closed City of Santa Maria, San Luis Obispo, or other municipal electrical permit
- Passed building-division inspection
- Invoice showing the California C-10 license used on the permit
- Photos of the old and new panel if the carrier’s letter asks for them
- Load calculation or panel schedule if the electrician produced one
Ask your agent for the exact list. Carriers do not publish a single national checklist.
Electricians who advertise this job
A shop is listed only if it advertises Federal Pacific, Zinsco, or insurance-driven panel replacement on its own site and prints a license number there. Trade-association locators already exist. We will not pad this list. Verify the license before you hire.
To get introduced, use the quote form on this page. We do not send you to the shop from here.
MAG Electric
Santa Maria, CA
Published license: CSLB #1115849 (CSLB)
Own homepage that names Federal Pacific and Zinsco panel replacement, insurance and pre-listing compliance, a $5,400 fixed-price Federal Pacific plus charger job, and prints CSLB License #1115849.
How this page was built
Compiled by Panel Letter on 2026-09-20 from the public pages below. If a fact was not on a cited page, it is marked as unverified in the copy. This is a research guide, not a bid.
- MAG Electric, homepage
Names Federal Pacific and Zinsco. Prints CSLB License #1115849. Publishes a $5,400 fixed price for a Santa Maria Federal Pacific replacement plus Tesla charger circuit. Prints a public shop email.
- City of Santa Maria, Building permit processing
Building Division counter at 110 S. Pine Street, Room 101. Phone 805-925-0951 x2241. Email CommDev@cityofsantamaria.org.
- City of Santa Maria, Building Division
Building Division monitors construction under Health and Safety Code 17960 and issues building permits.
- City of Santa Maria, Building FAQ
A permit is required for anything that involves electrical, mechanical, plumbing, or erecting of walls.
- CSLB, Building official information guide, owner-builder exemption
Homeowner improving a principal residence is exempt from licensure if work is before sale, they reside there 12 months before completion, and the exemption is used on no more than two structures in three years.
- PG&E, Electric and Gas Service Requirements (Greenbook)
Do not remove or interfere with PG&E meters, seals, padlocks, or locking devices. Applicants may not disconnect or connect to PG&E meters. Contact PG&E through the application process for meter removal.
- PG&E, Project resources
2026 Greenbook posted April 24, 2026. Job Owner is the PG&E contact for a service project.
- PG&E, Electric Rule 31
Only PG&E personnel or authorized agents may remove or reinstall a PG&E meter. Third parties may not breach the meter seal.
- CSLB, Check a license
Official California contractor-license lookup.